The Mid-West Planning District (MWPD) is responsible to ensure that submitted plans conform to the Zoning By-Laws for that property.

The Development Officer will evaluate each proposed sign based on its compliance with applicable zoning regulations.

Development Permit applications for a sign must include:

NOTE: A Building Permit may also be required for any construction associated with the sign.

Please note that incomplete applications will not be accepted.

INSPECTIONS & PENALTIES

cropped-pexels-burst-544965-scaled-1.jpg

Inspections

The Mid-West Planning District (MWPD) is to be notified once the sign is installed.

PLEASE NOTE: A minimum of 24 Hours Notice is required when booking inspections (weekend not included);

  • If the work is not ready for inspection or you need to cancel, please contact the MWPD office as soon as possible;
  • It is the responsibility of the APPLICANT to arrange for all inspections.
  • The MWPD assumes no responsibility for inspections that were not scheduled.
  • Inspections may be performed at random as determined by the Building Inspector.

Penalties

The following are subject to Penalty Fees in accordance with the MWPD’s Fee Structure By-Law:

  • Any sign installed prior to the appropriate permits being obtained.
  • Where the work is not ready for the time of the scheduled inspection.
  • Where project deficiencies result in repeated inspections by the inspector