The Mid-West Planning District (MWPD) is responsible to ensure that submitted plans conform to the Zoning By-Laws for that property.
The Development Officer will evaluate each proposed sign based on its compliance with applicable zoning regulations.
Development Permit applications for a sign must include:
- Completed Sign Application form
- Include sizes and placement of the sign
- Completed Site Plan if the sign is not mounted on a building.
- Fees in accordance with the MWPD’s Fee Structure By-Law.
NOTE: A Building Permit may also be required for any construction associated with the sign.
Please note that incomplete applications will not be accepted.
INSPECTIONS & PENALTIES
Inspections
The Mid-West Planning District (MWPD) is to be notified once the sign is installed.
PLEASE NOTE: A minimum of 24 Hours Notice is required when booking inspections (weekend not included);
- If the work is not ready for inspection or you need to cancel, please contact the MWPD office as soon as possible;
- It is the responsibility of the APPLICANT to arrange for all inspections.
- The MWPD assumes no responsibility for inspections that were not scheduled.
- Inspections may be performed at random as determined by the Building Inspector.
Penalties
The following are subject to Penalty Fees in accordance with the MWPD’s Fee Structure By-Law:
- Any sign installed prior to the appropriate permits being obtained.
- Where the work is not ready for the time of the scheduled inspection.
- Where project deficiencies result in repeated inspections by the inspector