Above-Ground Pools & Hot Tubs

pexels-dmitriy-zub-6546230

The Mid-West Planning District (MWPD) is responsible to ensure that submitted plans conform to the Zoning By-Laws for that property.

For locating an above-ground pool or hot tub on your property you are required to obtain a Development Permit.

Development Permits for above-ground pools or hot tubs must include

  • Completed Development Permit Application.
  • Detailed Site Plan.
  • Details of the basin construction.
  • Letter of Authorization is required if you are applying on behalf of the landowner.
  • Status of Title(s) for all land subject to the application if the land has changed owners in the last 30 days. The Status of Title(s) cannot be more than 30 days old. Additionally, a letter from your lawyer may be required if the property is in the process of being transferred to your name.
  • Total Project value (i.e., final project costs including all material and labour).
  • Fees in accordance with the MWPD’s Fee Structure By-Law.

In-ground pools require a Building Permit as well.

Building Permits for in-ground pools:

  • Completed Building Permit Application.
  • Detailed Site Plan.
  • Details of the basin construction.
  • Letter of Authorization is required if you are applying on behalf of the landowner.
  • Status of Title(s) for all land subject to the application if the land has changed owners in the last 30 days. The Status of Title(s) cannot be more than 30 days old. Additionally, a letter from your lawyer may be required if the property is in the process of being transferred to your name.
  • Total Project value (i.e., final project costs including all material and labour).
  • Fees in accordance with the MWPD’s Fee Structure By-Law.

Electrical Permits are obtained through Manitoba Hydro.

If the proposed development is located adjacent to a Provincial Road or Highway, an additional permit may be required from the Province (Manitoba Infrastructure) when applying for a permit from the MWPD.

Please note that incomplete applications will not be accepted.


 

INSPECTIONS & PENALTIES

cropped-pexels-burst-544965-scaled-1.jpg

Inspections

The Mid-West Planning District (MWPD) is to be notified at each of the following stages of site prep, as applicable:

  1. Excavation & Footing;
  2. Final - placement and fencing.

PLEASE NOTE: A minimum of 24 Hours Notice is required when booking inspections (weekend not included);

  • If the work is not ready for inspection or you need to cancel, please contact the MWPD office as soon as possible;
  • It is the responsibility of the APPLICANT to arrange for all inspections.
  • The MWPD assumes no responsibility for inspections that were not scheduled.
  • Inspections may be performed at random as determined by the Building Inspector.
  • This list is not all-inclusive. There may be additional inspections required at the discretion of the Building Inspector.

Penalties

The following are subject to Penalty Fees in accordance with the MWPD’s Fee Structure By-Law:

  • Any Building, Structure or Land Use that is commenced prior to the appropriate permits being obtained.
  • Where the work is not ready for the time of the scheduled inspection.
  • Where project deficiencies result in repeated inspections by the inspector.
  • Where the work has been covered and the inspector is unable to perform the required inspection. (this may also require invasive structural inspection at the applicant/contractor’s expense)